107 Voortrekker Road, Bellville

Student accommodation for Bellville, approved and under construction.

A purpose built residence of 887 beds for universities and colleges in the northern suburbs, with a first phase of 386 beds for the 2027 academic year.

Ambition House

107

Voortrekker Road
Bellville, Cape Town

887

beds in the approved scheme

386

beds in Phase 1, for 2027

15 Aug

2026, City of Cape Town plan approval

2028

whole-building occupation available

The building

Approved plans. Construction under way.

Ambition House is a residence built to be let to institutions. The City of Cape Town approved the plans on 15 August 2026 under approval 0049357, and Phase 1 is under construction.

No on-site parking is required under the approved plans.

Rooms adapted to your standard

The room configuration can be adjusted to meet the accreditation standard of the institution, including two-sharing layouts.

Backup power

A standby generator keeps the building running through load shedding.

Delivered in phases

Phase 1 serves the 2027 intake. The remaining beds follow, so an institution can grow into the building.

Getting to campus

  • Bellville public transport interchange

  • Existing rail routes

  • Minibus taxi routes along Voortrekker Road

Location

On Voortrekker Road, opposite UWC's nursing facilities.

Bellville is the transport hub of the northern suburbs. Students reach the interchange, the rail network and the main minibus taxi corridors from the door, and the building sits close to the health sciences teaching and clinical sites around Tygerberg.

A strong fit for nursing and health sciences cohorts, and for any institution looking for supply near Bellville.

For universities and colleges

Three ways to work with us.

Beds are offered at the prevailing NSFAS accommodation rates applicable to your institution.

01

Inspect the site

Visit Ambition House with your housing and facilities teams and walk the approved plans and the Phase 1 build.

02

Begin accreditation for 2027

Enter the off-campus accreditation process so the building is ready to place students for the 2027 intake.

03

Plan for 2028

Share your supply chain contact and procurement timetable so a whole-building arrangement can be considered from February 2028.

Enquire

Speak to the team.

Tell us who you are and what you need. We reply within two working days to arrange an inspection or a call.

Please enter your last name.
Please enter your company.
Please enter a valid email address.
Please confirm you are not a robot.